PHASE 1
Scaffold
AGENTS
Stark (lead)
WHAT HAPPENS
Initialize framework, configs, directory structure, types. Set up the test runner. Every placeholder references the PRD.
VERIFICATION GATE
This phase must pass its gate before proceeding to the next. Both manual verification and automated checks are required. Gate failure stops the build — no exceptions.