Skip to main content

PHASE 1

Scaffold

AGENTS

Stark (lead)Kusanagi

WHAT HAPPENS

Initialize framework, configs, directory structure, types. Set up the test runner. Every placeholder references the PRD.

VERIFICATION GATE

This phase must pass its gate before proceeding to the next. Both manual verification and automated checks are required. Gate failure stops the build — no exceptions.