PHASE 0
Orient
AGENTS
Picard (lead)
WHAT HAPPENS
Read the PRD. Validate frontmatter. Extract architecture. Wong loads LESSONS.md and project-scoped LEARNINGS.md. Troi verifies extraction. Phase 0.5: Picard's Conflict Scan.
VERIFICATION GATE
This phase must pass its gate before proceeding to the next. Both manual verification and automated checks are required. Gate failure stops the build — no exceptions.