Skip to main content

PHASE 0

Orient

AGENTS

Picard (lead)All agents read PRDWong (loads lessons + operational learnings)Troi (PRD verification)

WHAT HAPPENS

Read the PRD. Validate frontmatter. Extract architecture. Wong loads LESSONS.md and project-scoped LEARNINGS.md. Troi verifies extraction. Phase 0.5: Picard's Conflict Scan.

VERIFICATION GATE

This phase must pass its gate before proceeding to the next. Both manual verification and automated checks are required. Gate failure stops the build — no exceptions.