Skip to main content

PHASE 2

Infrastructure

AGENTS

Kusanagi (lead)Banner (DB)

WHAT HAPPENS

Database, Redis, environment config. Verify: dev server starts, DB connects, tests pass.

VERIFICATION GATE

This phase must pass its gate before proceeding to the next. Both manual verification and automated checks are required. Gate failure stops the build — no exceptions.