PHASE 12
Deploy
AGENTS
Kusanagi (lead)
WHAT HAPPENS
Provision infrastructure, configure DNS/SSL, deploy pipeline, monitoring, backups. Coulson tags the release. Health check must pass.
VERIFICATION GATE
This phase must pass its gate before proceeding to the next. Both manual verification and automated checks are required. Gate failure stops the build — no exceptions.